Patch on Patch
Years of tar and mastic patches stack up at laps. We test whether they hold or cut them out so the coating bonds to clean metal.
As a Lyons metal roof coating contractor, we bring older metal roofs back into service with a round of screw and lap repairs, then a full coating.

Lyons metal roof coating jobs often involve roofs that have been patched for years. Coating works only over panels that are still firm, so the walk looks for rust-through, missing screws, and wet insulation first.
Older roofs usually need a full round of fastener replacement and lap reinforcement before coating. Main-street storefronts and ag buildings in town often carry several generations of patches, each tested before it stays.

Older roofs carry a history. These four conditions decide the repair list.
Years of tar and mastic patches stack up at laps. We test whether they hold or cut them out so the coating bonds to clean metal.
Screw holes widen over time. Oversized fasteners grip fresh metal and stop the leak at each hole.
Eaves and gutters rust first on old roofs. Holed sections get patched with matching metal or replaced.
Leaks left for years soak insulation. Moisture readings find it, and wet areas come out before coating.
Old butyl and caulk at the laps dries and cracks with age. It gets cut out where loose, and fabric and fresh sealer go in its place.
Stains that came back for years mark the worst laps on the roof. We trace them from inside and add those spots to the top of the repair list.
For an older roof, coating after repairs keeps the building in use and adds service life. Compare it with full replacement.
| Roof Factor | Coat The Roof | Replace The Roof |
|---|---|---|
| Older panels | Kept, repaired, and sealed | Removed and replaced |
| Worn screw holes | Oversized screws and sealed heads | New holes in new panels |
| Planning cost | About $2.50 to $4.00 per sq ft | About $5 to $8 per sq ft |
| Business below | Stays open | Disrupted during tear-off |
| Next upkeep | Recoat the topcoat | Screw and seam checks |
Older roofs in Lyons fit these systems. The roof walk, the moisture readings, and the patch tests decide which one your building gets.

Older R-panel roofs with stripped screws take the full metal build after a complete round of fastener replacement, lap reinforcement, and rust priming.
Metal roof coating
Low sections with years of ponding take silicone once drains are cleared, wet insulation is cut out, and any sagging deck under the pond is repaired.
Silicone roof coating
Steeper older panels with faded, chalky paint take acrylic over primer, after the chalk is washed off and failed patches at the laps are removed.
Acrylic roof coating
Leaky, drafty shops on aging lots can take spray foam over dry panels with a UV topcoat, closing hundreds of small leak points under one layer.
Spray foam roofing
Shingled fronts that still lie flat on older buildings can be coated in the same visit, once lifted tabs are sealed and the deck passes a probe test.
Shingle roof coatingCall and tell us the roof's age and how many leaks you see. We bring screws to the walk and test a few spots.
Older roofs get more repair time up front. This is the order.

We walk the roof, check every patch and lap, count stripped and missing screws, and take moisture readings wherever leaks have run for years.
Loose tar and mastic patches come off down to clean metal, and the ones that still hold are tested for adhesion before we decide to keep them.
Stripped screws are replaced with oversized fasteners, missing ones are filled, and every head gets sealed, which on old roofs stops many leaks on its own.
Laps get fabric set in fresh sealer, brittle old caulk is cut out, and rusted areas at eaves and gutters get ground and primed with a rust-inhibiting primer.
Base and top coats go on to the specified thickness, followed by a final walk with wet-mil checks and photos of every repaired area.
We serve these towns too. Not listed? Call us or send us a message.
Commercial roofs booked around the late-spring-to-fall coating season.
Waterloo metal roof coatingQuestions from owners of older buildings in Lyons about old patches, worn screw holes, matching panels, foam, and what the repair list includes.
Coating works only over panels that are still firm. We check for rust-through, loose or missing screws, and wet insulation, then fix them, and the coating seals the roof as one surface.
Age alone is fine. Panel strength, rust-through, and wet insulation decide it, and the roof walk answers that.
Patch removal, a full screw round, lap fabric, and wet insulation removal. Coating plans at about $2.50 to $4.00 per square foot.
Firm, well-adhered patches stay and get primed. Loose or cracked ones come off first.
Every stripped, missing, or backed-out screw. The repair list gives the count from the walk.
Foam makes sense when the building also needs insulation or the roof has hundreds of small leaks. Otherwise, the coating build after repairs costs less and keeps the panel profile.
Most older R-panel and PBR profiles are still made, and we measure rib spacing on the walk. A replacement panel is primed and coated with the rest of the roof so it blends in.
Photos, counts of screws and laps, square footage, and the coating system, laid out so you can compare prices line by line with any other roof proposal.
Send the roof's age and size, and we walk it and list every repair before pricing.